GEOStrike
Recon
Pin a location or open a boring, then run recon.
Advisory only. Not a locate, survey, or engineering judgment. Disclaimer
Utilities and terrain at the dropped pin, out to 1 mile. Overlay marks stay at 200 ft. As-staked holes are locked at 150 ft.
Open a project to sketch a field line or edit imported KML. Field lines stay off the official pipeline list.
—
Pin Boring As staked Hospital Rally
— · EPSG:4326 · drag to pan · drop pin, as staked, or draw a polygon
Layers
HIFLD 69 kV lines are public-domain transmission — voltage and owner show on the popup. OSM power (lines, minor lines, poles) is incomplete, especially rural co-ops. © OpenStreetMap contributors, ODbL. Retail areas are HIFLD polygons and often overlap.
Type a coordinate or pick a boring
One Call / 811
Type a ticket number and Add, or drop an Excel sheet. Refresh tickets from this tab when you want an update.
Notify not earlier than 14 days and not later than 2 working days before you dig. If start slips past 14 days from that notice, file again.
No tickets yet. Type a number, drop an Excel sheet, or paste a copy.